Recently for a Chubb Company insurance quote, we had to answer
Do the managers of the site, Next DC, have flood prevention action plans in place? Please can you provide details of plans if known.
The answer took a while but was :
Extensive site due diligence was conducted prior to building M1, ensuring that it was built 1 meter above the 100 year flood line, outside of bushfire prone areas and in a non-seismic zone. The fire suppression system in a data hall takes 2 minutes to deploy after smoke is detected.